Section J Solid Waste Management Units
Section J.1 RFI #1
Section J.2 RFI #2
Section J.3 RFI #3
Section J.4 RFI #4
Section J.5 SWMU #1
Section J.6 SWMU #2
Section J.7 SWMU #3
Section J.8 SWMU #4
Section J.9 SWMU #5
Section J.10 SWMU #6
Section J.11 SWMU #7
Section J.12 SWMU #8
Section J.13 SWMU #9
Section J.14 SWMU #10
Section J.15 SWMU #11
Section J.16 SWMU #12
Section J.17 SWMU #13
Section J.18 SWMU #14
Section J.19 SWMU #15
Section J.20 SWMU #16
Section J.21 SWMU #17
Section J.22 SWMU #18
Section J.23 SWMU #19
Section J.24 SWMU #20
Section J.25 SWMU #21
Section J.26 SWMU #22
Section J.27 SWMU #23
Section J.28 SWMU #24
Section J. 29 SWMU #25
Section J.30 SWMU #26
Section J.31 SWMU #27
Section J.32 SWMU #28
Section J.33 SWMU #29
Section J.34 SWMU #30
Section J.35 SWMU #31
Section J.36 SWMU #32
Section J.37 SWMU #33
Section J.38 SWMU #34
Section J.39 SWMU #35
Section J.40 References
Section P Post-Closure Site Requirements
Section P.1 General Part A Information
Section P.1.a Description of Activities
Section P.1.b Site Name, Mailing Address and Location
Section P.1.c Standard Industrial Code
Section P.1.d Facility Operator/Owner
Section P.1.e Site Status
Section P.1.f Description of Process fpor TSD
Section P.1.g Specification of the Hazardous Wastes Listed or Designated
Section P.1.h Listing of All Permits or Construction Approvals Received or Applied For
Section P.2 Part B General Description
Section P.3 Part B General Requirements
Section P.3.a Topographic map
Section P.3.b Additional Information on the Topographic Map for Land Disposal Activities
Section P.3.c Facility Location Information
Section P.3.c(1) Political Jurisdiction in which Site Is Located
Section P.3.c (2) Floodplain Requirements
Section P.3.c (3) Seismic Standard
Section P.4 Waste Characteristics
Section P.4.a Chemical and Physical Analyses
Section P.4.b Waste Analysis Plan
Section P.5 General Hydrogeologic Information
Section P.5.a Topographic Map Requirements
Section P.5.b Contaminant Plume Description
Section P.5.c General Monitoring Requirements
Section P.5.c (1) Detection Monitoring Program
Section P.5.d Description of Wells- Groundwater Monitoring Well Network
Section P.5.e Proposed Sampling and Statistical Analysis Procedures for Groundwater Data
Section P.5.e (1) Sampling and Analysis Procedures
Section P.5.e (2) Statistical Analysis
Section P.5.f Corrective Action Program
Section P.5.g Characterization of Contaminated Groundwater
Section P.5.h Concentration Limits
Section P.5.i Alternate Concentration Limits
Section P.5.j Corrective Action Plan
Section P.6 Security
Section P.6.a Security Procedures and Equipment
Section P.6.a (1) Warning Signs
Section P.6.b Inspection Schedule
Section P.6.b (1) General Inspection REquirements
Section P.7 Procedures to Prevent Hazards
Section P.7.a Waiver or Documentation of Preparedness and Prevention Requirements
Section P.7.b Emergency Equipment
Section P.7.c Water and Fire Control
Section P.7.d Testing and Maintenance of Equipment
Section P.7.e Documentation of Arrangements with Emergency Agencies
Section P.7.f Document Agreement Refusal
Section P.7.g Equipment and Power Failure
Section P.8 Contingency Plan General information
Section P.9 Outline of Introductory and Continuing Training Programs
Section P.10 Closure Plan
Section P.11 Post-Closure Plan
Section P.11.a Post-Closure Care Contact
Section P.12 Notices Required for Disposal Facilities
Section P.13 Post-Closure Cost Estimate
Section P.14 Financial Assurance Mechanism for Post-Closure Care
Section P.15 Use of State Required Mechanisms
Section P.16 SWMUS
Section P.16.a Characterize the SWMUS
Section P.16.b Releases
Section P.16.b (1) Characterize and Monitor Releases
Section P.17 Part B Certification
Section P.18 Information on the Potential for the Public to Be Exposed to Releases